A complete application package consists of the following components (refer to Steps to Generator Installation):
  1. Complete Signed, and Dated Application
  2. Processing Fee
  3. One Line Electrical Schematic
  4. Site Plan
  5. Proof of Insurance
  6. Technical Specification Documents

Application to Interconnect

After you have read the detailed procedures in the Interconnection Guidelines and Steps to Generator Installation, you will need to complete the applicable application.

Completed application packages must be submitted by mail to:


The Connecticut Light and Power Company
Distributed Resources
P.O Box 1409
Hartford, CT 06143-1409